Call now Book a Service
LIML · LIN · Milan, Italy

Complete Detail at Milan Linate (LIML)

Paint decon, polish, brightwork and full interior detail in one visit—the reference standard before a sale.

Complete Detail at Milan Linate is the reference standard for super-midsize through ultra-long-range business jets preparing for a pre-buy inspection, a delivery or the start of a season. We bring the full exterior and interior detail sequence to the Linate Prime apron or hangar: wash, clay-bar decontamination, single-stage polish, brightwork, cabin vacuuming, leather and veneer treatment, galley and lav deep-clean, and disinfection of all touch surfaces. The work takes two to five days, and you receive a photographic report documenting the aircraft before and after. Chief pilots and flight-department managers use this visit to reset the aircraft's appearance to a known baseline.

Runway

17/35 · 2442 m

AIP and airport data
Elevation

353 ft

Operating hours

H24

Distance

7 km

Milan city centre
Handling agents

5 on the airport

independent, no affiliation
GA terminal

Milano Linate Prime – Business & General Aviation terminal (SEA Prime)

What is included in a Complete Detail at Milan Linate?

The visit begins with an exterior dry wash or rinseless wash to lift dust and organic film. We then clay-bar the paint to remove bonded contamination—industrial fallout, tree sap, insect residue—that washing alone will not shift. A single-stage machine polish follows, cutting through oxidation and light scratches to restore gloss and depth. Brightwork—nacelle rings, cheat-line trim, gear-door edges—is polished by hand to match the paint.

Inside, we vacuum the entire cabin and flight deck, treat all leather with pH-neutral cleaner and conditioner, clean veneer and high-gloss surfaces, scrub the galley and lav to catering standard, shampoo soft goods where needed, and disinfect every touch surface. The tech log is photographed at handover, and a full before-and-after report is compiled in the hangar or on stand. If the aircraft is cold-soaked or has been through a winter of charter, we schedule the work across three to five days to allow proper dwell time for treatments and controlled drying.

Why does a Complete Detail take two to five days?

Paint decontamination and polishing cannot be rushed. Clay-barring every panel, working the machine polisher at safe speeds, and hand-finishing brightwork and leading edges all require daylight and stable temperature. If the aircraft has been stored or flown through a deicing season, we often find paint that needs two passes, gear bays that need degreasing, and belly panels that need careful attention to avoid disturbing static ports or pitot probes.

The cabin sequence is equally methodical. Leather must be cleaned, allowed to breathe, then conditioned. Veneer and high-gloss composites need separate chemistry. Galley appliances, lav fixtures and soft goods each have their own protocol. We schedule the work so that no surface is over-treated and no material is left damp. At Linate the slot-coordinated environment and the Linate Prime infrastructure let us plan a multi-day visit without disrupting your next positioning, and the handler is accustomed to third-party detailing crews working airside under escort.

What changes at Milan Linate for a detailing crew?

Milan Linate sits at 353 feet elevation, seven kilometres from the city centre, and operates around the clock. The airport is slot-coordinated, so every arrival and departure is scheduled in advance; spontaneous repositioning is rare. Business aviation is concentrated at Milano Linate Prime, the dedicated general-aviation terminal managed by SEA Prime, with five handling agents present at the airport. The single runway—17/35, 2 442 metres, redesignated from the old 18/36 numbering in late 2023—handles a dense mix of scheduled airline traffic and private movements, which means tight turnaround discipline and little tolerance for extended ground time without prior arrangement.

For a multi-day detail we coordinate with your handler to secure hangar space or a stand clear of the active apron. Linate is Italy's busiest business-aviation airport, so competition for covered workspace is real, especially during the fashion weeks and summer positioning waves. Our airside pass and escort are arranged through the handler; we bring our own water and power, and we schedule each phase—wash, decon, polish, interior—around your next departure slot. The Linate Prime infrastructure is built for high-value aircraft, and the handlers expect third-party specialists to work to the same standard they enforce for line service.

When should an operator schedule a Complete Detail?

Most flight departments book this service once or twice a year: before the summer season, after a winter of European charter, or in the lead-up to a pre-buy inspection or sale. If the aircraft has been through repeated deicing cycles, flown behind volcanic ash advisories, or parked near an industrial zone, the paint will carry contamination that a dry wash will not remove. If the cabin has seen back-to-back charter legs, high-profile passengers or catering spills, a full interior detail and disinfection reset the environment to delivery standard.

We also see this service requested when an aircraft joins a new fleet or changes management company. The photographic report becomes the baseline for future maintenance planning, and the detail itself removes any question about the aircraft's condition at handover. At Linate the combination of hangar availability, handler experience and proximity to Milan makes it a natural choice for a scheduled detail that does not pull the aircraft out of European rotation for long.

How does the photographic report work?

We photograph the aircraft in its arrival state—exterior panels, leading edges, belly, gear bays, brightwork, cabin seats, galley, lav, flight deck—before any work begins. The images are date-stamped and logged against the tech-log entry. After the detail is complete, we shoot the same angles in the same light, so that the before-and-after comparison is direct and honest.

The report is delivered as a PDF, organised by zone: nose to tail on the exterior, forward cabin to aft lav on the interior. Flight-department managers use it to document the aircraft's condition for insurance, pre-buy or sale purposes. It also serves as a record of work done, which is useful if a question arises weeks later about a panel or a seat. The photography is straightforward—we are not marketing photographers—but the detail is forensic, and the sequence is repeatable.

What does the handler need to know when we arrive?

The handler needs three things: confirmation that we hold a valid airside pass for Linate, a clear understanding of the work scope and duration, and coordination on stand or hangar allocation. We send a pre-arrival brief that lists our equipment, our water and power requirements, and our planned schedule. If the aircraft will remain on stand, we confirm that the location is clear of jet blast and that GPU access will not be interrupted. If hangar space is available, we work with the handler to position the aircraft after the engines cool.

Because Linate is slot-coordinated, the handler also needs to know your next departure time so that the detail can be phased to finish with margin. We do not ask for special treatment, but we do need the handler to escort us airside, to notify us of any apron moves, and to coordinate waste disposal for used microfibre, spent polish and cabin refuse. The handlers at Linate Prime are accustomed to third-party service providers; they expect professionalism, and they provide it in return.

Questions operators ask about Complete Detail at Milan Linate

How long does a Complete Detail take at Milan Linate?

Two to five days, depending on aircraft size, paint condition and whether hangar space is available. The exterior sequence—wash, decon, polish, brightwork—typically requires two to three days in stable conditions. The interior detail adds one to two days, depending on cabin configuration and the condition of soft goods. We schedule the work to avoid rushing any treatment and to respect your next departure slot.

Can the work be done on the ramp, or is hangar space required?

Paint polishing and interior work are best done in a hangar, but we can adapt to covered stand or apron if weather and handler logistics allow. A hangar offers controlled temperature, protection from wind-blown dust and privacy for the cabin detail. If hangar space is not available, we work on stand with temporary shelter for the interior phases. The handler at Linate Prime will coordinate the location based on your aircraft's schedule and the airport's traffic flow.

What is paint decontamination, and why does it matter?

Decontamination removes bonded contamination—fallout, sap, insect residue—that washing cannot shift, preparing the paint for polish. We use a clay bar or chemical decon to lift particles embedded in the clear coat. This step is essential before polishing; without it, the polisher will drag contamination across the paint, causing new scratches. Decon is especially important after a winter season or after parking near industrial areas.

Is the photographic report included in the price?

Yes, the before-and-after photo report is included in every Complete Detail at no additional cost. We document the aircraft's condition on arrival and after the detail is finished. The report is organised by zone and delivered as a PDF. Flight departments use it for insurance records, pre-buy documentation or maintenance planning.

Can you work around a tight departure slot?

Yes, but we need advance notice of the slot so we can phase the work and finish with margin. Linate is slot-coordinated, so every departure is scheduled. We coordinate with your handler to plan each phase—wash, decon, polish, interior—so that the aircraft is ready at least two hours before engine start. If the slot changes, we adapt the sequence, but last-minute compression can affect the final result.

Do you disinfect the cabin as part of the Complete Detail?

Yes, we disinfect all touch surfaces—seats, armrests, belts, galley, lav, flight-deck controls—using aviation-safe chemistry. Disinfection is the final interior step, applied after cleaning and conditioning. We use products that are effective against bacteria and viruses but safe for leather, veneer and avionics. The treatment is logged in the photographic report.

What if the aircraft needs paint correction beyond a single-stage polish?

We assess the paint on arrival and discuss any additional correction—wet-sanding, multi-stage polish—before proceeding. If the paint shows deep scratches, heavy oxidation or clear-coat failure, a single-stage polish may not be enough. We document the condition, explain the options and provide a revised timeline. Any work beyond the standard scope is agreed in writing before we begin.

How do you handle water and waste disposal at Linate?

We bring our own water and coordinate waste disposal with the handler, following the airport's environmental and ramp-safety rules. Linate has strict rules on water use and waste handling. We use rinseless or dry-wash methods where possible, and we collect all spent polish, used microfibre and cabin refuse for proper disposal. The handler arranges the bins and confirms that we leave the stand or hangar clean.

Can you detail an aircraft that has just come out of heavy maintenance?

Yes, and this is a common use case—removing masking residue, polishing repainted panels and resetting the cabin after MX work. Aircraft returning from heavy checks often have paint overspray, adhesive residue from masking tape and dust from panel work. We decontaminate and polish the affected areas, clean the cabin of MX debris and disinfect all surfaces. The photographic report documents the aircraft's post-MX condition.

What happens if weather delays the work at Milan Linate?

We reschedule the exterior phases and, if possible, continue interior work under cover until conditions improve. Paint polishing requires stable temperature and low humidity; rain or high wind will stop the exterior sequence. If weather intervenes, we move to the cabin detail or pause the work entirely, coordinating with the handler and your flight department to adjust the schedule. Linate's H24 operation and hangar access give us flexibility, but we will not compromise the final result to meet an unrealistic deadline.

Other services at Milan Linate