Complete Detail at Florence Peretola (LIRQ)
Pre-sale and seasonal deep-clean services for business jets visiting Tuscany's capital airport
Complete Detail at Florence Peretola is the reference standard when you need a photographic record of the aircraft's condition—before a pre-buy inspection, a delivery flight or the start of a season. We decontaminate paint, polish to a single-stage finish, restore brightwork, deep-clean the cabin and flight deck, then disinfect and photograph every detail. The work takes two to five days, usually inside a hangar, and is planned around your slot, the handling agent's schedule and the short runway's displaced-threshold performance limits at this city-centre field.
05/23 · 1560 m
AIP and airport data142 ft
5 km
Florence city centre (north-west)3 on the airport
independent, no affiliationWhy does a complete detail take several days at Florence?
Decontamination cannot be rushed. We strip industrial fallout, tree sap, insect strikes and the fine Tuscan dust that works its way into every panel gap, then clay the paint to a glass-smooth surface before the single-stage polish. Brightwork—nacelle lips, leading edges, winglets—is polished by hand in multiple passes. Inside, we remove every loose article, vacuum the hidden plenum grilles and seat tracks, treat leather with pH-neutral cleaners, then disinfect hard and soft surfaces to hospital standard.
The photographic report alone requires two or three hours: before-and-after pairs of every exterior panel, the cheat line, the belly, gear bays, the cabin from a dozen angles, even the static ports and pitot covers in place. That record becomes the baseline for your next pre-buy or the proof a buyer needs that the aircraft has been maintained to the highest appearance standard.
Hangar time is almost always required. Florence's single 1,560-metre runway and its proximity to the Apennine foothills mean autumn and winter bring low cloud, and the short slot windows mean you cannot afford a rain interruption halfway through a polish. We coordinate with the handling agent to confirm hangar availability before we quote a start date.
What changes at Florence Peretola for a multi-day detail?
Florence Peretola sits at 142 feet elevation, five kilometres north-west of the city centre, and operates a single runway—05/23, only 1,560 metres long with displaced thresholds at both ends. That short strip and the surrounding terrain mean performance planning is tighter than at Pisa or Bologna, especially when the aircraft is cold-soaked or the stand is far from the threshold. If your jet will remain on the apron for three or four days, confirm with your handler that the slot and stand assignment allow a rolling departure window; a fixed PPR time can become a problem if the detail runs an hour over.
Four handling agents are present at the airport: Signature Aviation (Signature Florence), Sky Services, AviaVIP (Argos VIP Private Handling) and Toscana Aeroporti Handling—the last being the airport operator's own team. Each has its own procedures for third-party contractors airside. We hold an escort pass, but some handlers prefer their own ramp marshal to remain with us whenever the GPU is connected or when we open panels for belly and gear-bay access. Ask your handler which protocol applies; it costs nothing and avoids a standstill on day two.
Florence is slot-coordinated. If your detail coincides with the summer peak or a long weekend, request the slot as soon as the hangar and our schedule align. A missed slot can mean a twenty-four-hour slip, and that may push the final inspection into a curfew window or a handler shift change.
What does Tuscan climate do to paint and cabin between details?
Tuscany's summers are hot and dry; the apron at Florence regularly sees thirty-five degrees in July and August, and that heat bakes road film, pollen and agricultural dust onto the paint. If the aircraft has flown into Peretola from a coastal strip—Olbia, Nice, Cannes—salt haze adds another layer. By September the paint feels gritty to the touch, and a simple dry wash will not remove the bonded contamination; only a clay-bar decontamination and polish will.
Inside, the Tuscan sun through the cabin windows heats leather to the point where oils migrate to the surface, then oxidise. Untreated, that oxidation becomes a grey bloom that no amount of dusting will shift. We treat every leather surface with a cleaner that lifts the oxidised oil, then apply a conditioner with UV inhibitors. The result is a cabin that looks—and smells—like it did at delivery.
Brightwork tarnishes faster here than in northern Europe. The combination of heat, humidity from the Arno valley and occasional Saharan dust events means nacelle lips and leading edges lose their mirror finish in six months. We polish brightwork to the OEM standard, then apply a hydrophobic sealant that doubles the interval before the next treatment.
How does the photographic report work, and who needs it?
We shoot between two hundred and three hundred images per aircraft: every exterior panel in raking light to show paint depth and any remaining blemishes, close-ups of the cheat line and registration, the belly from nose to tail, each gear bay, the nacelles, winglets and control surfaces. Inside, we document the flight deck, every cabin zone, the galley, the lavatory, even the carpet seams and the stitching on the seats. Each image is time-stamped and geotagged.
The before-and-after pairs go into a PDF report, typically forty to sixty pages, indexed by airframe section. If you are preparing for a pre-buy inspection, the buyer's surveyor will compare our images with his own findings; discrepancies are rare, and that consistency shortens the inspection and smooths the negotiation. If you are taking delivery of a jet that has just come out of paint or refurbishment, the report becomes the baseline for your first annual detail.
Chief pilots use the report to justify the maintenance budget to the owner. A picture of a polished nacelle beside a tarnished one, or a disinfected cabin beside a neglected one, makes the case better than any narrative. We deliver the report within twenty-four hours of the final walk-around, and we keep a copy in our records for three years.
What do Florence handlers expect from a detailing crew on the ramp?
Every handler at Florence wants the same things: no surprises, no spills, no interference with their own turnaround schedule. We notify the handler forty-eight hours before we arrive, confirm the stand number and the GPU type, and ask whether they require their own marshal present when we open panels or connect ground power. Some do, some do not; the answer depends on their insurance and their relationship with the airport authority.
We bring our own water in sealed containers—Florence has seasonal restrictions on potable water for aircraft washing—so we never ask to tap the apron hydrant. All waste goes into our own containers and leaves the airside with us. If we are working in a hangar, we confirm ventilation and lighting with the handler the day before; some hangars at Florence are shared, and the schedule can shift if another aircraft arrives AOG.
Handlers appreciate a single point of contact. Our crew leader carries a radio on the apron frequency and a mobile that rings through to the handler's duty desk. If the detail runs past the agreed window, we tell them immediately; if we finish early, we tell them that too, so they can release the stand or the hangar bay. That communication costs nothing and ensures we are invited back.
When should you schedule a complete detail at Florence?
The ideal moment is before a pre-buy inspection or a sale, when the photographic record and the restored appearance can add tens of thousands to the transaction value. The second-best moment is at the start of the season—April or May—so the aircraft enters the busy summer months with protected paint, conditioned leather and a cabin that smells fresh after the first leg.
Some operators schedule a complete detail twice a year: once in spring, once in autumn after the summer's heat and dust have taken their toll. That cadence keeps the paint in single-stage condition, meaning you never need a compound-and-polish cycle that removes microns of clear coat. It also means the cabin never reaches the point where stains have set or leather has cracked.
Avoid scheduling a detail during the peak summer weeks unless you have a firm slot and hangar booking. Florence is slot-coordinated, and July and August bring heavy leisure traffic into Tuscany; a delayed detail can cascade into a missed positioning flight or a charter commitment. If your calendar is rigid, talk to us and your handler together; we can often start the exterior work on the apron at dawn, then move the aircraft into the hangar for the interior and the final polish.
Questions operators ask about Complete Detail at Florence Peretola
How long does a complete detail take at Florence Peretola?
Two to five days, depending on aircraft size and the extent of contamination. A super-midsize jet in good condition typically needs two to three days; an ultra-long-range aircraft with heavy soiling or neglected brightwork can take four or five. We confirm the duration after an initial walk-around and share the schedule with your handler so the slot and stand are coordinated.
Do you need a hangar, or can you work on the apron?
We prefer a hangar for the interior and the final polish, but we can start the exterior wash on the apron if weather and handler schedule allow. Decontamination and the first polish stage can be done outside in stable weather, but the cabin detail and the photographic report require shelter from sun and wind. Florence's handlers can usually arrange hangar time if you request it with the slot.
What is included in the photographic report?
Before-and-after images of every exterior panel, brightwork, the cabin, flight deck, galley and lavatory, delivered as a time-stamped PDF. We shoot two hundred to three hundred images per aircraft, indexed by section, with close-ups of any areas that required extra attention. The report is delivered within twenty-four hours and is often used by buyers, surveyors and chief pilots to document the aircraft's condition.
Can you detail an aircraft that is due for a pre-buy inspection?
Yes—that is one of the most common reasons operators book a complete detail. A pre-buy surveyor will compare his findings with our photographic report, and a freshly detailed aircraft presents better than one that has sat on the ramp for weeks. The detail also reveals any paint or interior issues before the surveyor does, giving you time to address them or adjust the negotiation.
What if it rains halfway through the detail?
We pause the exterior work and move into the hangar for the cabin detail, then resume the polish when the paint is dry. Florence's autumn and winter can bring sudden showers from the Apennines. If rain interrupts the exterior work, we do not restart until the paint has dried naturally; forced drying can trap moisture under the polish. The photographic report documents any weather delays.
Do you bring your own water, or use the airport hydrant?
We bring our own water in sealed containers; Florence has seasonal restrictions on potable water for washing. The airport authority and some handlers limit hydrant use during the summer months, so we arrive with enough deionised water for the entire detail. That also means we control water quality and avoid any minerals that could spot the paint.
How often should a complete detail be done?
Once or twice a year, depending on flight hours, climate exposure and whether the aircraft is for sale. Operators who fly frequently in dusty or coastal environments often schedule a complete detail every six months. Those who fly less, or who hangar the aircraft between trips, can stretch the interval to once a year. Before a sale or a pre-buy inspection, a complete detail is almost always worthwhile.
What do you do with the belly and gear bays?
We degrease, scrub and rinse the belly and each gear bay, then dry and photograph them as part of the report. Belly grime—hydraulic mist, oil, carbon—builds up over hundreds of hours and can mask corrosion or fluid leaks. We remove it without high pressure near avionics bays or static ports, then document the clean structure so your maintenance team can inspect it properly at the next check.
Can you coordinate directly with my handler at Florence?
Yes—we notify the handler forty-eight hours before arrival and confirm stand, GPU and any airside-escort requirements. Every handler at Florence has slightly different procedures for third-party contractors. We ask which protocol applies, whether they want their own marshal present during panel access, and when the hangar or stand will be available. That coordination prevents delays and keeps the detail on schedule.
What happens if the detail takes longer than planned?
We notify you and the handler immediately, explain the reason and agree on a revised completion time. Delays are rare, but if we find unexpected paint damage, heavy contamination or a cabin stain that requires a second treatment, we do not cut corners. The photographic report will show why the extra time was needed, and most handlers can adjust the stand or hangar schedule if we give them early notice.